Undertaken by Northumbrian Water, the Winep –
Kirklevington Transfer was part of a £5 million scheme
to improve the performance and flexibility of the area’s
wastewater network and wastewater treatment.
DMJ undertook the installation of 1200m of 225mm MDPE pipe, including the
installation of all related air valves and washouts with the construction of all
the chambers.
Street works involved excavating 200m of the carriageway to a depth of 2.2 and
installing pre-welded pipe to avoid egress into the excavation.
Gravel was then laid on top of the laid pipe, followed by foam backfill into the trench
to within 200mm of the surface to allow the carriageway to be reinstated.
With all pipe installed, DMJ pressure tested the whole line to 7 bar. The completed
pipeline was left full of water until the client was ready for the final connection.