HDVC Interconnect

Project: Viking Link

Client: Balfour Beatty

Viking Link is a 1,400 MW HDVC submarine power cable linking the United Kingdom and Denmark. Completed in 2023, it is the longest land and subsea HDVC interconnector in the world and runs from Bicker Fen in Lincolnshire and Revsing in southern Jutland, Denmark.

Throughout the project’s life, which began in 2020, DMJ was awarded multiple packages by Balfour Beatty on behalf of British National Grid plc.

Services delivered by DMJ:

  • Easement fencing
  • Access point construction
  • Culvert Construction
  • Pre-construction land drainage
  • Topsoil removal
  • Subsoil realignment
  • Post construction drainage
  • Subsoil ripping
  • Topsoil replacement
  • Culvert removal
  • Fencing removal