Case Studies

Need help?

Direct Power Link

Project: Neuconnect Substation

Client: Siemens Energy

The NeuConnect interconnector will create the first direct power link between Germany and Great Britain, connecting two of Europe’s largest energy markets for the first time.

Construction began in 2024 and will see around 725km of land and subsea cables form an ‘invisible highway’ between Germany and Great Britain. When completed, in 2028, up to 1.4GW of electricity will be able to flow in either direction, which is enough to power up to 1.5 million homes over the life of the project.

DMJ was appointed by Siemens Energy in 2024 as part of the initial construction
phase.

Services delivered by DMJ:

  • Temporary laydown area
  • Welfare hard-standing area
  • Footpath construction
  • Culvert installation
  • Ducting for carpark lighting
  • Access tarmac road
  • Access points (tarmac) to site

Careers Request

Fill out the form below, and we will be in touch when we have a suitable role.

Contact Information
Role Information